{"id":56122,"date":"2026-02-18T19:35:56","date_gmt":"2026-02-18T19:35:56","guid":{"rendered":"https:\/\/www.odemocratagb.com\/?p=56122"},"modified":"2026-02-18T19:35:57","modified_gmt":"2026-02-18T19:35:57","slug":"avis-general-de-passation-des-marches-2","status":"publish","type":"post","link":"https:\/\/www.odemocratagb.com\/?p=56122","title":{"rendered":"AVIS GENERAL DE PASSATION DES MARCHES"},"content":{"rendered":"\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\"><strong>AVIS GENERAL DE PASSATION DES MARCHES<\/strong><\/td><\/tr><tr><td><strong>PAYS&nbsp;:<\/strong><\/td><td><strong>R\u00c9PUBLIQUE DE LA GUIN\u00c9E-BISSAU<\/strong><\/td><\/tr><tr><td><strong>NOM DU PROJET<\/strong><\/td><td><strong>PROJET DE MISE A L\u00b4ECHELLE DES PRATIQUES D\u00b4AGRICULTURE INTELLIGENTE DANS L\u00b4EST DE LA GUIN\u00c9E-BISSAU.<\/strong><\/td><\/tr><tr><td><strong>REFERENCE DE ACCORD DE GESTION DON<\/strong><\/td><td><strong>201930\/DON FA GB 2019 12 00<\/strong><\/td><\/tr><tr><td><strong>FINANCEMENT<\/strong><\/td><td><strong>FONDS ADAPTATION-BOAD<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Le Gouvernement de la R\u00e9publique de Guin\u00e9e Bissau a obtenu un Don du Fonds d\u00b4Adaptation (FA) et de la Banque Ouest Africaine de D\u00e9veloppement (BOAD) pour le financement du Projet de Mise \u00e0 l\u00b4Echelle des Pratiques d\u00b4agriculture Intelligente dans l\u00b4Est de la Guin\u00e9e Bissau (PMEPAI-GB), et se propose d&#8217;utiliser les fonds de ce Don pour r\u00e9gler des fournitures, travaux et services devant \u00eatre acquis dans le cadre du Projet.<\/p>\n\n\n\n<p>Le projet comprend les quatre (04) composantes&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les march\u00e9s financ\u00e9s dans le cadre de cette composante sont essentiellement des contrats de services<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><a><strong>N. \u00ba<\/strong><\/a><strong><\/strong><\/td><td><strong>Objet<\/strong><strong><\/strong><\/td><td><strong>Description<\/strong><strong><\/strong><\/td><td><strong>M\u00e9thode de passation march\u00e9<\/strong><strong><\/strong><\/td><td><strong>Date probable pour soumission du projet de march\u00e9 \u00e0 la Banque<\/strong><strong><\/strong><\/td><td><strong>Date pr\u00e9vue pour lancement du march\u00e9\/consultant<\/strong><strong><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong>&nbsp;MARCH\u00c9 DE TYPES SERVICES <\/strong><strong><sup><\/sup><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 1<\/u><\/strong><strong>&nbsp;: Renforcement de capacit\u00e9s techniques et institutionnels pour faire face \u00e0 la multiplication des risques climatique avec les pratiques et la planification de l\u00b4adaptation<\/strong><strong><\/strong><\/td><\/tr><tr><td>1<\/td><td>MARCHE N. \u00ba 001\/PMEPAI-GB\/2026<\/td><td>Evaluation de la vuln\u00e9rabilit\u00e9 socio-climatique dans l\u00b4Est de la Guin\u00e9e-Bissau.<\/td><td>AON<\/td><td>Mars -2026<\/td><td>Avril 2026<\/td><\/tr><tr><td>2<\/td><td>MARCH\u00c9 N. \u00ba 002\/PMEPAI-GB\/2026<\/td><td>Evaluation des besoin e capacit\u00e9 technique des Minist\u00e8res et des agents sur le terrain sur la planification de l\u00b4adaptation.<\/td><td>AON<\/td><td>Mars -2026<\/td><td>Avril 2026<\/td><\/tr><tr><td>3<\/td><td>MARCH\u00c9 N. \u00ba 003\/PMEPAI-GB\/2026<\/td><td>Formulation d\u00b4un plan d\u00b4intervention d\u00e9taill\u00e9e pour des action pilotes d\u00b4agriculture intelligente face au climat.<\/td><td>AON<\/td><td>Mars -2026<\/td><td>Avril 2026<\/td><\/tr><tr><td>4<\/td><td>MARCH\u00c9 N. \u00ba 004\/PMEPAI-GB\/2026<\/td><td>Am\u00e9lioration des politiques, proc\u00e9dures et directives du pays par l&#8217;int\u00e9gration des questions li\u00e9es au changement climatique, au genre et \u00e0 la gestion durable des ressources naturelles.<\/td><td>AOR<\/td><td>Mars-2026<\/td><td>Avril 2026<\/td><\/tr><tr><td>5<\/td><td>MARCH\u00c9 N. \u00ba 005\/PMEPAI-GB\/2026<\/td><td>D\u00e9veloppement d\u00b4un syst\u00e8me de suivi et d\u00b4\u00e9valuation.<\/td><td>AOR<\/td><td>Mars-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 2<\/u><\/strong><strong>&nbsp;: Renforcer la r\u00e9silience des syst\u00e8mes existants de productions agricole, y compris les mesures de maitrise et de gestions.&nbsp;<\/strong><\/td><\/tr><tr><td>6<\/td><td>MARCH\u00c9 N. \u00ba 006\/PMEPAI-GB\/2026<\/td><td>Etudes\/Demande proposition compl\u00e9mentaires d&#8217;APD, r\u00e9alisation de sous projets EIES, mise \u00e0 jour ESMP, DAO, supervision et contr\u00f4le des travaux.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td>7<\/td><td>MARCH\u00c9 N. \u00ba 007\/PMEPAI-GB\/2026<\/td><td>Etude\/Demande de proposition d\u00b4Am\u00e9nagement des Bas-Fond dans le cadre des projets du fonds d&#8217;adaptation.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td>8<\/td><td>MARCH\u00c9 N. \u00ba 008\/PMEPAI-GB\/2026<\/td><td>Etude\/demande de proposition de construction de micro-barrages avec les syst\u00e8mes d&#8217;irrigation.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td>9<\/td><td>MARCH\u00c9 N. \u00ba 009\/PMEPAI-GB\/2026<\/td><td>\u00c9tudes\/demande de proposition compl\u00e9mentaires de l&#8217;APD, r\u00e9alisation des ESIA des sous-projets, DAO, supervision et contr\u00f4le des travaux de construction des rampes.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td>10<\/td><td>MARCH\u00c9 N. \u00ba 010\/PMEPAI-GB\/2026<\/td><td>\u00c9tudes\/demande de proposition g\u00e9otechniques APD et suivi des travaux.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td>11<\/td><td>MARCH\u00c9 N. \u00ba 011\/PMEPAI-GB\/2026<\/td><td>\u00c9tudes\/demande de proposition compl\u00e9mentaires de l&#8217;APD, r\u00e9alisation des ESIA des sous-projets, DAO, supervision et contr\u00f4le des travaux de construction des rampes.<\/td><td>Liste Restreinte<\/td><td>Fev-2026<\/td><td>Avril-2026<\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 3<\/u><\/strong><strong>&nbsp;: Gestions des Connaissances sur les enseignements tir\u00e9s de l\u00b4agriculture intelligente face au climat et de la planification d\u2019adaptation<\/strong><\/td><\/tr><tr><td>12<\/td><td>MARCH\u00c9 N. \u00ba 012\/PMEPAI-GB\/2026<\/td><td>3.1.2-D\u00e9veloppement et animation du site web du projet.<\/td><td>AON<\/td><td>Avril-2026<\/td><td>Mai-2026<\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 4&nbsp;:<\/u><\/strong><strong> Cout Ex\u00e9cution du Projet.&nbsp;<\/strong><\/td><\/tr><tr><td>13<\/td><td>MARCH\u00c9 N. \u00ba 013\/PMEPAI-GB\/2026<\/td><td>4.1.3.1-Audit et comptes.<\/td><td>AON<\/td><td>Mars-2026<\/td><td>Avril-2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les march\u00e9s financ\u00e9s dans le cadre de cette composante sont essentiellement des contrats de fournitures<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>N. \u00ba<\/strong><strong><\/strong><\/td><td><strong>Objet<\/strong><strong><\/strong><\/td><td><strong>Description<\/strong><strong><\/strong><\/td><td><strong>M\u00e9thode de passation march\u00e9<\/strong><strong><\/strong><\/td><td><strong>Date probable pour soumission du projet de march\u00e9 \u00e0 la Banque<\/strong><strong><\/strong><\/td><td><strong>Date pr\u00e9vue pour lancement du march\u00e9\/consultant<\/strong><strong><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong>&nbsp;MARCH\u00c9 DE TYPES FOURNITURE<\/strong><strong><sup><\/sup><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 1<\/u><\/strong><strong>&nbsp;: Renforcement de capacit\u00e9s techniques et institutionnels pour faire face \u00e0 la multiplication des risques climatique avec les pratiques et la planification de l\u00b4adaptation<\/strong><strong><\/strong><\/td><\/tr><tr><td>14<\/td><td>MARCH\u00c9 N. \u00ba 014\/PMEPAI-GB\/2025<\/td><td>Achat de mat\u00e9riel pour op\u00e9rationnalisation des pompiers\/brigade communautaire pour combattre les incendies<\/td><td>AON<\/td><td>Avril-2026<\/td><td>Mai-2026<\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 2&nbsp;: Renforcer la r\u00e9silience des syst\u00e8mes existants de productions agricole, y compris les mesures de maitrise et de gestions.&nbsp; <\/u><\/strong><strong><u><\/u><\/strong><\/td><\/tr><tr><td>15<\/td><td>MARCH\u00c9 N. \u00ba 015\/PMEPAI-GB\/2025<\/td><td>Soutien aux groupes pour le d\u00e9frichage et le labourage des sites<\/td><td>AON<\/td><td>Mars-2025<\/td><td>Avril -2025-2024<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les march\u00e9s financ\u00e9s dans le cadre de cette composante sont essentiellement des contrats de travaux<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>N. \u00ba<\/strong><strong><\/strong><\/td><td><strong>Objet<\/strong><strong><\/strong><\/td><td><strong>Description<\/strong><strong><\/strong><\/td><td><strong>M\u00e9thode de passation march\u00e9<\/strong><strong><\/strong><\/td><td><strong>Date probable pour soumission du projet de march\u00e9 \u00e0 la Banque<\/strong><strong><\/strong><\/td><td><strong>Date pr\u00e9vue pour lancement du march\u00e9\/consultant<\/strong><strong><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong><sup>MARCH\u00c9 DE TYPE STRAVAUX<\/sup><\/strong><strong><sup><\/sup><\/strong><\/td><\/tr><tr><td colspan=\"6\"><strong><u>Composante 2<\/u><\/strong><strong>&nbsp;: Renforcer la r\u00e9silience des syst\u00e8mes existants de productions agricole, y compris les mesures de maitrise et de gestions.&nbsp; <\/strong><strong><sup><\/sup><\/strong><\/td><\/tr><tr><td>16<\/td><td>MARCH\u00c9 N. \u00ba 016\/PMEPAI-GB\/2025<\/td><td>Mise \u00e0 l&#8217;\u00e9chelle de sites partiellement d\u00e9velopp\u00e9s dans l&#8217;ancien projet LDCF.<\/td><td>AOI<\/td><td>Out-2026<\/td><td>Nov-2026<\/td><\/tr><tr><td>17<\/td><td>MARCH\u00c9 N. \u00ba 017\/PMEPAI-GB\/2025<\/td><td>Construction de banques de semences<\/td><td>AOR<\/td><td>Out-2026<\/td><td>Nov-2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Tous les march\u00e9s de travaux, de services et de fourniture financ\u00e9s par le Projet devront passer conform\u00e9ment aux proc\u00e9dures sp\u00e9cifiques dans les Directives<em>&nbsp;pour la Passation des march\u00e9s de biens, travaux et services (autres que les services consultants) financ\u00e9s par un pr\u00eat ou une avance de fonds de la Banque Ouest Africaine de D\u00e9veloppement<\/em>, \u00e9dition de mars 2013 ou aux proc\u00e9dures nationales de l\u2019emprunteur, conform\u00e9ment aux dispositions de l\u2019Accord de Don. Tous les fournisseurs\/entrepreneurs r\u00e9pondant aux crit\u00e8res de provenance d\u00e9finis dans les Directives sont admis \u00e0 soumissionner.<em> Les consultants seront choisis conform\u00e9ment aux Directives pour la Passation des march\u00e9s de consultant financ\u00e9s par un pr\u00eat ou une avance de fonds de la Banque Ouest Africaine de D\u00e9veloppement, \u00e9dition de mars 2013.<\/em><\/p>\n\n\n\n<p>Les avis sp\u00e9cifiques relatifs aux diff\u00e9rents march\u00e9s qui doivent \u00eatre pass\u00e9s conform\u00e9ment aux proc\u00e9dures d\u00b4appel \u00e0 la concurrence nationale et internationale de la BOAD seront publi\u00e9s sur le site web de la Banque (<a href=\"http:\/\/www.boad.org\">www.boad.org<\/a> ), et dans le quotidien national de large diffusion de la Guin\u00e9e Bissau. Les premiers avis sp\u00e9cifiques de march\u00e9 seront probablement publi\u00e9s en<strong> : F\u00e9vrier -2026.<\/strong><\/p>\n\n\n\n<p>Les soumissionnaires potentiels qui remplissent les crit\u00e8res requis et ayant besoin de renseignements compl\u00e9mentaires devront envoyer leur requ\u00eate \u00e0 l\u00b4adresse ci-dessous&nbsp;:<\/p>\n\n\n\n<p>Minist\u00e8re de l\u00b4Environnement et de l\u00b4Action Climatique\u2013 Projet de Mise \u00e0 Echelle des Pratiques d\u00b4Agriculture Intelligente dans l\u00b4Est de la Guin\u00e9e-Bissau,&nbsp;\u00ab Pal\u00e1cio do Governo- Avenida Jo\u00e3o Bernardo Vieira-Minist\u00e9rio do Ambiente e A\u00e7\u00e3o Clim\u00e1tica \u00bb Casimiro Jorge Sanca- <a href=\"mailto:casimirosanca@yahoo.com.br\">casimirosanca@yahoo.com.br<\/a> et <a href=\"mailto:felisgomes10@gmail.com\">felisgomes10@gmail.com<\/a> Tel&nbsp;: (+245) 95&nbsp;580 48 27 ou (+245) 95&nbsp;542 68 03 &nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AVIS GENERAL DE PASSATION DES MARCHES PAYS&nbsp;: R\u00c9PUBLIQUE DE LA GUIN\u00c9E-BISSAU NOM DU PROJET PROJET DE MISE A L\u00b4ECHELLE DES&#8230;<\/p>\n","protected":false},"author":4,"featured_media":31741,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-56122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-anuncios","wpcat-14-id"],"_links":{"self":[{"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/posts\/56122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56122"}],"version-history":[{"count":1,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/posts\/56122\/revisions"}],"predecessor-version":[{"id":56123,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/posts\/56122\/revisions\/56123"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=\/wp\/v2\/media\/31741"}],"wp:attachment":[{"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.odemocratagb.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}